天天5g天天爽人妻熟女,熟妇多毛,无码aaaaa,国产熟女高潮

Sorry, you are not login!
VIP members can check the contents after login.
Click to login

  • TOP
  • Moblie
    All Prompt Messages

    Tradesns Foreign Trade Community
    Current page location: Home Page > Information
    Article author
    Concern (1)
      Other developments of the company
    Municipal Party Secretary Li Gongle and Mayor Wang Xinwei inspected Henan Zhongbo Company
    Browse volume:326 | Reply:1 | Release time:2021-08-15 08:08:28

    On the morning of December 20th, 2017, Anyang Municipal Party Secretary Li Gongle and Mayor Wang Xinwei led the leaders of relevant departments of the city to inspect Henan ZhongBo Railway Technology Co., Ltd., accompanied by Longan District Party Secretary Gao Qinke.

    Municipal Party Secretary Li Gongle, Mayor Wang Xinwei and other leaders got off the car and inspected the company's products.

    Company product display

    The company’s chairman Guo Zhongyan introduced the development of the company.

    Gao Qinke, secretary of the Long'an District Party Committee, inspects the company's high-speed EMU brake pads.

    The company’s chairman Guo Zhongyan reported to the municipal party committee secretary Li Gongle and the mayor Wang Xinwei on the application of the company’s products on the high-speed rail line.

    Vistors inspected the company’s modern production workshop.

    The production workshop is holding a morning meeting.

    Heroic and energetic workers

    Modern spray plastic production line.

    Standard and orderly stacking of finished products.

    Workshops of Henan ZhongBo Railway Technology Co., Ltd
    Henan ZhongBo Railway Technology Co., Ltd. project is jointly funded and constructed by Shanghai Huibo Investment Company and Anyang Railway Equipment Co., Ltd. It is a key project of Anyang City in 2017. The total investment of the project is 400 million yuan, covering an area of 100 acres and a total construction area. About 78,000 square meters. After the project is completed, it can produce 150,000 tons of rail equipment products annually, which will be sold to domestic and international markets.
    The company currently covers an area of 13,000 square meters of the first phase of the plant has been completed, and 3 Vossloh iron pad production lines have been put into operation. The second phase of the plant has a total area of 24,000 square meters, divided into two east and west buildings. At present, the main parts of the two plant buildings have been completed. The pipeline network, equipment foundation, windows and glass in the plant are under construction and is expected to be completed by the end of the month.
    The company will gradually complete two automated spring clips production lines and one high-speed rail nut automated production line, curved track bolt production line, resin sleeper production line and high-speed rail brake pad production line after the production workshop is completed and put into production. The total investment of the project is 200 million yuan, and the annual sales income is expected to reach 600 million yuan after it is put into production, and the annual profit and tax will be 100 million yuan.

    Concern (0
    Commentary(1)
    Share
      1. XuYanli
        Company: ANYANG RAILWAY EQUIPMENT CO., LTD Contact Person: Ms. Xu Yanli E-mail: info@at-railfasteners.com Mobile Phone: 0086-15003728689(WhatsApp) WeChat: Yanli81 Website: https://www.at-railfasteners.com/ Facebook: https://www.facebook.com/atrailfastener
        2021-09-14 15:56:45
    Popular
    Relevant